Inspection Status: Not Ready

Inspection History: COT - LCBU - Framing

Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing Not Ready
03/30/2023 COT - LCBU - Framing Re-inspection required March 30th: approved plans not on site, maintain min 1" clearance around B-vent to combustibles, maintain min 10 feet from fresh air intake to vents, support flex duct off sprinkler pipe thru-out, fire block top of mechanical chase, vertical fire blocking can not exceed 10 feet, smoke det is within 3 feet of register
08/22/2023 COT - LCBU - Framing Re-inspection required 8-22-23: Work is covered; contact inspector who viewed corrections to obtain approval.
08/24/2023 COT - LCBU - Framing Passed