Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | Not Ready | ||
| 04/05/2023 | COT - RSME - Mechanical Final | Canceled | Cody Martel called to cancel his inspection. He will reschedule at a later date. | |
| 04/19/2023 | COT - RSME - Mechanical Final | Re-inspection required | Cody Martel called to cancel his inspection. He will reschedule at a later date. 4/19/23: met Cody at site. Install condensate leg on gas line at air handler, support exterior nonmetallic conduit by condenser and insulate line set at both units. |
|
| 10/25/2023 | COT - RSME - Mechanical Final | Re-inspection required (with fee) | Cody Martel called to cancel his inspection. He will reschedule at a later date. 4/19/23: met Cody at site. Install condensate leg on gas line at air handler, support exterior nonmetallic conduit by condenser and insulate line set at both units. 10/25/23: none of the corrections from the 4/19/23 inspection have been completed. Pay a reinspection fee before scheduling the next inspection. |
|
| 11/03/2023 | COT - RSME - Mechanical Final | Passed |