Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Framing | Not Ready | ||
| 06/07/2023 | COT - LCBU - Framing | Re-inspection required | 6-7-24: 1-Water pipe is leaking. 2-DWV piping is leaking. 3-Complete truss repair. 4- Seal hole in fire block made by plumber. | |
| 06/08/2023 | COT - LCBU - Framing | Re-inspection required | plumber. 6-8-23: 1-Truss repair calls for scabs on both sides, not just one. 2-Dead spaces, such as at duct chase and Master Bathroom need 3/4" minimum plywood for fire-blocking. |
|
| 06/09/2023 | COT - LCBU - Framing | Passed |