Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2023 | BULD - Electrical Clearance | Not Ready | ||
| 07/26/2023 | BULD - Electrical Clearance | Passed | Not required. TEP has already installed meter. |