Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
Permit Number - T22CM07315
Inspection Description - BULD - Electrical Clearance
Inspection Status - Canceled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2023 | BULD - Electrical Clearance | Canceled | canceled per contractor | |
| 04/28/2023 | BULD - Electrical Clearance | Canceled | 4/28/23: inspection canceled per AJ | |
| 05/01/2023 | BULD - Electrical Clearance | Re-inspection required | 4/18/23: cancel per AJ 5/1/23: blocks all register boxes, connect line set to attic air handler, minimum 30" AC platform required on the working side of the unit, install a attic access hole and a catwalk to the working side of the AC platform, vents have been altered. Retest by filling thru the roof, gas line not under test, fire block top of chase, seal penetrations in the top plate, electric is incomplete. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT REINSPECTION. |
|
| 05/08/2023 | BULD - Electrical Clearance | Canceled | 4/28/23: inspection canceled per AJ 4/18/23: cancel per AJ 5/1/23: blocks all register boxes, connect line set to attic air handler, minimum 30" AC platform required on the working side of the unit, install a attic access hole and a catwalk to the working side of the AC platform, vents have been altered. Retest by filling thru the roof, gas line not under test, fire block top of chase, seal penetrations in the top plate, electric is incomplete. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT REINSPECTION. 5/8/23: cancel electric clearance inspection, not ready |
|
| 06/29/2023 | BULD - Electrical Clearance | Passed | 4/28/23: inspection canceled per AJ 4/18/23: cancel per AJ 5/1/23: blocks all register boxes, connect line set to attic air handler, minimum 30" AC platform required on the working side of the unit, install a attic access hole and a catwalk to the working side of the AC platform, vents have been altered. Retest by filling thru the roof, gas line not under test, fire block top of chase, seal penetrations in the top plate, electric is incomplete. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT REINSPECTION. 5/8/23: cancel electric clearance inspection, not ready 6/29/23: INCR CLEARANCE |