Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM07315

Parcel: 133541950


Addresses:

9965 E CALDERA PL


Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - T22CM07315

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Canceled

Date Description Inspector Results Comments
04/18/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 4/18/23: cancel per AJ
04/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 4/28/23: inspection canceled per AJ
05/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 4/18/23: cancel per AJ
5/1/23: blocks all register boxes, connect line set to attic air handler, minimum 30" AC platform required on the working side of the unit, install a attic access hole and a catwalk to the working side of the AC platform, vents have been altered. Retest by filling thru the roof, gas line not under test, fire block top of chase, seal penetrations in the top plate, electric is incomplete. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT REINSPECTION.
05/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/8/23: 2nd failed intermediate. Install a unobstructed catwalk to the AC platform, AC platform required to be 30" deep on the working side of the unit and the width of the unit, install primary and secondary condensate lines to the AC unit, install a switched light to AC unit at the shuttle opening, provide a Manual J S & D to the city for review of the new AC unit and new duct and register boxes, seal top of chase.
05/10/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 5/8/23: 2nd failed intermediate. Install a unobstructed catwalk to the AC platform, AC platform required to be 30" deep on the working side of the unit and the width of the unit, install primary and secondary condensate lines to the AC unit, install a switched light to AC unit at the shuttle opening, provide a Manual J S & D to the city for review of the new AC unit and new duct and register boxes, seal top of chase.

5/10/23: I called AJ at 1 pm and left message with his office to let him know I will be on site at 2. I waited until 2:15 and left. Inspection canceled due to no show.
05/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required
05/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 5/8/23: 2nd failed intermediate. Install a unobstructed catwalk to the AC platform, AC platform required to be 30" deep on the working side of the unit and the width of the unit, install primary and secondary condensate lines to the AC unit, install a switched light to AC unit at the shuttle opening, provide a Manual J S & D to the city for review of the new AC unit and new duct and register boxes, seal top of chase.

5/25/23: Inspection canceled per AJ.

5/10/23: I called AJ at 1 pm and left message with his office to let him know I will be on site at 2. I waited until 2:15 and left. Inspection canceled due to no show.
05/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed