Inspection History Details
Inspection Status: Not Ready
Inspection History: RSME - Mechanical Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSME - Mechanical Progress | Not Ready | ||
| 06/15/2023 | RSME - Mechanical Progress | Re-inspection required | 6-15-24: 1-Tighten Ufer connection with conductor at apex of connector. 2-Need second receptacle for second bay of garage on dedicated circuit. 3- Smoke detector missing outside front bedroom. 4-Gas is at 3 psi.. 5- Duct work is in wrong location upstairs. | |
| 06/16/2023 | RSME - Mechanical Progress | Re-inspection required | 6-15-24: 1-Tighten Ufer connection with conductor at apex of connector. 2-Need second receptacle for second bay of garage on dedicated circuit. 3- Smoke detector missing outside front bedroom. 4-Gas is at 3 psi.. 5- Duct work is in wrong location upstairs. 6/16/23: Need second receptacle for second bay of garage on dedicated circuit, Duct work still in wrong location upstairs. |
|
| 06/20/2023 | RSME - Mechanical Progress | Passed |