Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 01/24/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 11/02/2023 |
ENGR Engineering Final
|
|
Partial Pass |
sewer cleanout in driveway needs to be flush with concrete, remove protruding bolt in porch concrete (east edge) and protect water spigot at northeast corner of building. |