Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 7/12/23: no one on site, both side gates are locked. No access. | |
| 07/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 08/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 8/7/23: Partial pass--Rough framing and electrical rough-in is complete. Plumbing and mechanical still needs to be tested and approved before passing of systems and clearance can be given. | |
| 08/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 7/12/23: no one on site, both side gates are locked. No access. 8/7/23: Partial pass--Rough framing and electrical rough-in is complete. Plumbing and mechanical still needs to be tested and approved before passing of systems and clearance can be given. 8/29/23: electric is NOT complete. Electric is incomplete and not per plan. Remove electric box from shower. Revise approved plans to show the new sub-panel in laundry room, revise city approved plans to show new sub-panel. Vents are dry. Secure laundry box. Remove abandoned B-vent. Provide new attic venting for existing house on the north wall where new addition will block any ventilation. Fire-block south wall of new addition all openings into the attic of existing house. THIS INSPECTION STOPPED. More items may be added. |
|
| 08/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 7/12/23: no one on site, both side gates are locked. No access. 8/7/23: Partial pass--Rough framing and electrical rough-in is complete. Plumbing and mechanical still needs to be tested and approved before passing of systems and clearance can be given. 8/29/23: electric is NOT complete. Electric is incomplete and not per plan. Remove electric box from shower. Revise approved plans to show the new sub-panel in laundry room, revise city approved plans to show new sub-panel. Vents are dry. Secure laundry box. Remove abandoned B-vent. Provide new attic venting for existing house on the north wall where new addition will block any ventilation. Fire-block south wall of new addition all openings into the attic of existing house. THIS INSPECTION STOPPED. More items may be added. |
|
| 09/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | ||
| 09/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Need smoke detectors in new bedroom and outside of new bedroom. 2-Neutral bus is isolated from neutral conductor. | |
| 09/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |