Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Building Division - Site Excavation/Layout/Rebar
Permit Number - T22CM06474
Inspection Description - PDSD Building Division - Site Excavation/Layout/Rebar
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | North side footings for service bays/ writers. | ||
02/09/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 2/9/24: Service bays entry and exit slab are partially formed, rebar reinforcement is being epoxied into existing slab and having special 3rd party inspection done. Okay to pour concrete in these areas | |
03/05/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | Balance of footings for North service building. | |
03/07/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | Two columns footings in North service bay. | |
03/18/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | North service bays. | |
04/30/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 4/30/24: north service bays rebar to schedule okay to place concrete | |
09/07/2023 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 9/7/23: reinforcing for ramp per plan. | |
09/18/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 9/18/24: rebar to schedule and electrical conduit for light poles at north end of building parking lot. Okay to place concrete | |
10/24/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 8" air gap in meeting room. | |
11/18/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Partial Pass | 11/18/24: Rebar reinforcement is installed in first 8 bays on south side garage area. Okay to proceed with concrete pour for this footing. | |
11/20/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Passed | 11/20/24: Rebar reinforcement is installed in last 4 bays on south side garage area. Okay to proceed with concrete pour for this footing |