Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2024 |
RSBU - Building Final |
|
Not Ready |
|
| 02/08/2024 |
RSBU - Building Final |
|
Re-inspection required |
2/8/24: YWL must be insulated and wrapped for UV protection, Exterior plastic piping must be coated for UV protection, Vacuum breaker missing at hose bibs per plan, water hammer arrestor missing at dishwasher, plumbing under kitchen sink must be of smooth interior, dishwasher drain must be properly installed, water hammer arrestor missing at laundry and fridge, plumbing at lavatory not per code, cleanouts at exterior of units not capped and cut to grade, no ladder for roof access, Panel schedule missing, arc-faults missing, secure dishwasher in place, anti-tip missing at range, bathroom exhaust fans no power, bathroom lights no power, exhaust fan at laundry missing. Light covered under dry-wall. |
| 03/21/2024 |
RSBU - Building Final |
|
Not Ready |
|
| 03/27/2024 |
RSBU - Building Final |
|
Not Ready |
|
| 04/01/2024 |
RSBU - Building Final |
|
Passed |
|