Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Rough Soil
Permit Number - T22CM06021
Inspection Description - COT - RSPL - Rough Soil
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Rough Soil | Not Ready | ||
| 04/25/2024 | COT - RSPL - Rough Soil | Re-inspection required | 4/25/24: Plans are not approved by city. Set backs not per plan. STOPPED INSPECTION. | |
| 10/19/2023 | COT - RSPL - Rough Soil | Not Ready | ||
| 10/23/2024 | COT - RSPL - Rough Soil | Passed | ||
| 10/23/2024 | COT - RSPL - Rough Soil | Passed | ||
| 11/13/2023 | COT - RSPL - Rough Soil | Not Ready | 11/13/23: called at 2:49pm no answer, knocked on door no answer. No access | |
| 11/15/2023 | COT - RSPL - Rough Soil | Re-inspection required | 11/15/23: no plans on site, tracer wire missing on sewer trench and main water line trench, sewer and water service in same trench no allowed without proper spacing. |