Inspection Status: Not Ready
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - RSPL - Rough Soil |
|
Not Ready |
|
| 04/25/2024 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
4/25/24: Plans are not approved by city. Set backs not per plan. STOPPED INSPECTION. |
| 10/19/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
|
| 10/23/2024 |
COT - RSPL - Rough Soil |
|
Passed |
|
| 10/23/2024 |
COT - RSPL - Rough Soil |
|
Passed |
|
| 11/13/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
11/13/23: called at 2:49pm no answer, knocked on door no answer. No access |
| 11/15/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
11/15/23: no plans on site, tracer wire missing on sewer trench and main water line trench, sewer and water service in same trench no allowed without proper spacing. |