Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 02/02/2024 | ENGR Engineering Final | Not Ready | ||
| 02/08/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Fencing located at the North Center area located by mailbox station needs to be removed. Fencing located at the SE corner of basin area needs to be removed. South end center of parking lot storm water inlet basin area needs to be adjusted by Bright View Landscaping. Center East area of parking lot has a roll off dumpster steel wheel indentation that needs to be repaired. |
|
| 02/13/2024 | ENGR Engineering Final | Passed |