Permit: T22CM05879

Parcel: 10408078B


Addresses:

700 W AUTO MALL DR

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Building Progress

Date Description Inspector Results Comments
COT - HCBU - Building Progress Partial Pass partial approval for stem walls ok to grout to 2nd course and lead walls
05/19/2023 COT - HCBU - Building Progress Canceled 5-19-24: Needed masonry pre grout.
05/26/2023 COT - HCBU - Building Progress Partial Pass 5-26-23: Rebar vertical and horizontal reinforcement are in place for the 8' lift. Okay to grout masonry walls.
06/02/2023 COT - HCBU - Building Progress Partial Pass pre grout for service reception third lift on west, north walls, parts room 2nd lift south wall. east wall of restrooms 2nd lift
10/10/2023 COT - HCBU - Building Progress Partial Pass 5-19-24: Needed masonry pre grout.

5-26-23: Rebar vertical and horizontal reinforcement are in place for the 8' lift. Okay to grout masonry walls.

10/10/23: second floor deck slab ok to pour (reinforcement per plan pg.S103 note 1), roof nailing approved by special inspection.
11/09/2023 COT - HCBU - Building Progress Partial Pass Detail 244 and 242 on page S403 front soffit and parapet wall. East, West and South of building okay to proceed progress areas. 11/9/2023
12/01/2023 COT - HCBU - Building Progress Partial Pass Rooms #102 - #124 plumbing DWV and domestic water lines under pressure and secured. Electrical in walls okay to proceed progress areas. 12/1/2023
12/08/2023 COT - HCBU - Building Progress Passed