Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance was called into TEP at 3:00pm (powerkill) Pending Solar |
|
| 10/03/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |