Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - LCBU - Framing |
|
Not Ready |
|
| 01/04/2023 |
COT - LCBU - Framing |
|
Not Ready |
pending license contractor statement, stating they will take responsibility for the work that’s been done. |
| 02/20/2024 |
COT - LCBU - Framing |
|
Passed |
|
| 10/04/2023 |
COT - LCBU - Framing |
|
Partial Pass |
Pending letter stating full responsibility of the life of the building. Per work being completed without inspections. 10/4/2023 |
| 11/22/2023 |
COT - LCBU - Framing |
|
Re-inspection required (with fee) |
Provide receptacle at kitchen according to plans. Provide smoke detectors per plan. Insulate hot water lines. Provide arc fault breakers per plan. Re submit drawings as built.STOPPED INSPECTION. 11/22/2023 |