Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T22CM05616

Parcel: 116141360

Inspection Status: Canceled

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/09/2023 BULD - Electrical Clearance Canceled
06/12/2023 BULD - Electrical Clearance Partial Pass Partial for the MPU, INCR Clearance was called into TEP at 3:15pm (power-kill)
Pending Solar
08/10/2023 BULD - Electrical Clearance Canceled CA by Contractor
08/10/2023 BULD - Electrical Clearance Canceled CA by Contractor
08/21/2023 BULD - Electrical Clearance Re-inspection required NR, Revised and approved plans must be on site for inspection
08/21/2023 BULD - Electrical Clearance Re-inspection required NR, Revised and approved plans must be on site for inspection
10/03/2023 BULD - Electrical Clearance Passed Approved, DGC/BAT Clearance to TEP is required for the solar meter
10/03/2023 BULD - Electrical Clearance Passed Approved, DGC/BAT Clearance to TEP is required for the solar meter