Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2023 | BULD - Electrical Clearance | Canceled | ||
| 06/12/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the MPU, INCR Clearance was called into TEP at 3:15pm (power-kill) Pending Solar |
|
| 08/10/2023 | BULD - Electrical Clearance | Canceled | CA by Contractor | |
| 08/10/2023 | BULD - Electrical Clearance | Canceled | CA by Contractor | |
| 08/21/2023 | BULD - Electrical Clearance | Re-inspection required | NR, Revised and approved plans must be on site for inspection | |
| 08/21/2023 | BULD - Electrical Clearance | Re-inspection required | NR, Revised and approved plans must be on site for inspection | |
| 10/03/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT Clearance to TEP is required for the solar meter | |
| 10/03/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT Clearance to TEP is required for the solar meter |