Permit: T22CM05460

Parcel: 141433350

Inspection Status: Not Ready

Inspection History: RSME - Mechanical Progress 

Permit Number - T22CM05460

Inspection Description - RSME - Mechanical Progress 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 RSME - Mechanical Progress  Not Ready
06/18/2024 RSME - Mechanical Progress  Re-inspection required 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024
06/21/2024 RSME - Mechanical Progress  Re-inspection required 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024
6/21/24: per previous notes.
06/24/2024 RSME - Mechanical Progress  Passed