Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | ||
| 06/18/2024 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024 | |
| 06/21/2024 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024 6/21/24: per previous notes. |
|
| 06/24/2024 | COT - LCPL - Plumbing Intermediate | Passed |