Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - T22CM05460
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
06/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024 | |
06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6623. Not ready secure pex lines throughout ceiling along with gas line. Add backing to tub fixture. Block top ceiling going through second floor. Add nail plat at UF cable at kitchen island. Receptacle at kitchen, (box is broken). Secure or support 3” ABS at kitchen area in ceiling. Add blocking to all registers. Sleeve on electrical line has been damaged. Loose receptacle boxes. STOPPED INSPECTION. 6/18/2024 6/21/24: per previous notes. |
|
06/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 6/24/2024 |