Permit: T22CM05381

Parcel: 125160490

Inspection Status: Not Ready

Inspection History: COT - RSEL - Electrical Final 

Date Description Inspector Results Comments
10/27/2022 COT - RSEL - Electrical Final  Not Ready
04/04/2023 COT - RSEL - Electrical Final  Canceled NR- cancelled by contractor
04/06/2023 COT - RSEL - Electrical Final  Canceled not ready.
04/17/2023 COT - RSEL - Electrical Final  Re-inspection required Denied, overloaded panel with 70A back-fed breaker, plan approved with 225A rated panel, must increase panel or de-rate main
05/10/2023 COT - RSEL - Electrical Final  Passed Approved, DGC Clearance to TEP is required for the solar meter