Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Construction Power
Permit Number - T22CM05348
Inspection Description - COT - RSEL - Construction Power
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Construction Power | Not Ready | ||
03/20/2023 | COT - RSEL - Construction Power | Re-inspection required | ||
03/23/2023 | COT - RSEL - Construction Power | Canceled | Support 4-gang box both ends, block base of stair landing, block balloon framing at stairs every 10 feet, vents are dry, replace broken elect box at 2nd floor hallway, seal large gape in top plate at laundry dryer vent. March 23rd: cancel inspection per Chris. |
|
03/27/2023 | COT - RSEL - Construction Power | Passed | TEP ECO |