Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Above Ceiling
Permit Number - T22CM05035
Inspection Description - COT - LCBU - Building Above Ceiling
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCBU - Building Above Ceiling | Not Ready | ||
01/18/2023 | COT - LCBU - Building Above Ceiling | Partial Pass | hard lid ceiling are good and can be Sheetrocked. drop ceiling are being installed and are not ready for inspection. | |
02/07/2023 | COT - LCBU - Building Above Ceiling | Partial Pass | seismic wires need to be every 4 ft on longitudinal rails ok to install tiles on edges only | |
02/22/2023 | COT - LCBU - Building Above Ceiling | Partial Pass | Rooms 110, 117, 118, & 120 are complete. Okay to install ceiling tiles in these rooms. Room 106 the electrical and mechanical are in progress. Will call for inspection when ready. | |
02/24/2023 | COT - LCBU - Building Above Ceiling | Partial Pass | grid for grid ceilings is installed. Wires for light fixtures are in place. Fixtures are still about 2 weeks for delivery. Okay to install tiles in ceiling. | |
11/01/2023 | COT - LCBU - Building Above Ceiling | Passed |