Inspection Status: Not Ready
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Not Ready |
the area will be checked on 7/28/2023 too verify that all the work is per the approved plans. Handrail needs to be constructed per the Approved Plans prior to requesting the Final Inspection. |
| 08/14/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Not Ready |
Looked at the future handrail location for the emergency exit on the south-side of the building to change it to |
| 09/22/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Not Applicable |
|