Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2023 | COT - LCPL - Sewer | Re-inspection required | 8/23/23: sewer lines not on water test, expose building soil lines tied into sewer lines, expose all pipes at inlet and discharge to grease interceptor then water test interceptor. | |
| 08/24/2023 | COT - LCPL - Sewer | Partial Pass | 8/23/23: sewer lines not on water test, expose building soil lines tied into sewer lines, expose all pipes at inlet and discharge to grease interceptor then water test interceptor. 8/24/23: sewer line on south and west side of building approved to cover. |
|
| 09/27/2023 | COT - LCPL - Sewer | Passed |