Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 04/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | ||
| 04/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 4/21/2023: canceled per contractor request 4/26/23: canceled per Chris |
|
| 04/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/21/2023: canceled per contractor request 4/26/23: canceled per Chris. 4/28/23: block base of stair landing,repair abandoned fresh air intake hole,reseal holes in AC chase,support fresh air intake duct,repair register boxes,install stud shoes at 2nd floor over notch,AC duct touching B-vent in chase,nail plate vent at top and bottom plate. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION |
|
| 05/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5/3/2023: all previous corrections made, dwv not under test stud shoes needed on second floor | |
| 05/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |