Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 03/13/2023 | RSBU - Building Final | Re-inspection required | Bathroom receptacles not GFCI protected Bedroom light switches not controlling receptacles Wrong size breaker for AC at mane panel Bedroom receptacle hot&neutral reversed |
|
| 03/15/2023 | RSBU - Building Final | Passed |