Permit: T22CM04768

Parcel: 13213066A

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Permit Number - T22CM04768

Inspection Description - RSBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final  Not Ready
01/23/2024 RSBU - Building Final  Re-inspection required 12/14/23: not ready
1/23/24: UV coat all exterior pipes, weather strips at door missing,
01/25/2024 RSBU - Building Final  Partial Pass 12/14/23: not ready
1/23/24: UV coat all exterior pipes, weather strips at door missing,
1/25/24: Level 3 TCO
02/12/2024 RSBU - Building Final  Not Ready
02/14/2024 RSBU - Building Final  Partial Pass TCO 4
02/15/2024 RSBU - Building Final  Not Ready
02/16/2024 RSBU - Building Final  Partial Pass
03/08/2024 RSBU - Building Final  Re-inspection required 12/14/23: not ready
1/23/24: UV coat all exterior pipes, weather strips at door missing,
1/25/24: Level 3
TCO 4
3/8/24: called Ramon at 8:30am no answer.
03/11/2024 RSBU - Building Final  Not Ready no call back from contractor
03/15/2024 RSBU - Building Final  Passed
12/14/2023 RSBU - Building Final  Not Ready 12/14/23: not ready