Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T22CM04768
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
01/23/2024 | RSBU - Building Final | Re-inspection required | 12/14/23: not ready 1/23/24: UV coat all exterior pipes, weather strips at door missing, |
|
01/25/2024 | RSBU - Building Final | Partial Pass | 12/14/23: not ready 1/23/24: UV coat all exterior pipes, weather strips at door missing, 1/25/24: Level 3 TCO |
|
02/12/2024 | RSBU - Building Final | Not Ready | ||
02/14/2024 | RSBU - Building Final | Partial Pass | TCO 4 | |
02/15/2024 | RSBU - Building Final | Not Ready | ||
02/16/2024 | RSBU - Building Final | Partial Pass | ||
03/08/2024 | RSBU - Building Final | Re-inspection required | 12/14/23: not ready 1/23/24: UV coat all exterior pipes, weather strips at door missing, 1/25/24: Level 3 TCO 4 3/8/24: called Ramon at 8:30am no answer. |
|
03/11/2024 | RSBU - Building Final | Not Ready | no call back from contractor | |
03/15/2024 | RSBU - Building Final | Passed | ||
12/14/2023 | RSBU - Building Final | Not Ready | 12/14/23: not ready |