Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T22CM04766
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
01/17/2024 | RSBU - Building Final | Not Ready | ||
01/19/2024 | RSBU - Building Final | Not Ready | ||
01/23/2024 | RSBU - Building Final | Re-inspection required | 1/23/24: weather strip for door missing, door is hitting threshold, garage disposal drain must be installed properly, electrical for water heater not installed, | |
01/24/2024 | RSBU - Building Final | Partial Pass | 1/23/24: all exterior pipes must be UV coated, hosebib needs to be sealed at wall, 1/24/24: TCO LEVEL 3 |
|
02/12/2024 | RSBU - Building Final | Not Ready | ||
02/14/2024 | RSBU - Building Final | Partial Pass | TCO 4 | |
02/15/2024 | RSBU - Building Final | Not Ready | ||
02/16/2024 | RSBU - Building Final | Partial Pass | ||
02/20/2024 | RSBU - Building Final | Passed | ok for C OF O |