Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 01/17/2024 | RSBU - Building Final | Not Ready | ||
| 01/19/2024 | RSBU - Building Final | Not Ready | ||
| 01/23/2024 | RSBU - Building Final | Re-inspection required | 1/23/24: weather strip for door missing, door is hitting threshold, garage disposal drain must be installed properly, electrical for water heater not installed, | |
| 01/24/2024 | RSBU - Building Final | Partial Pass | 1/23/24: all exterior pipes must be UV coated, hosebib needs to be sealed at wall, 1/24/24: TCO LEVEL 3 |
|
| 02/12/2024 | RSBU - Building Final | Not Ready | ||
| 02/14/2024 | RSBU - Building Final | Partial Pass | TCO 4 | |
| 02/15/2024 | RSBU - Building Final | Not Ready | ||
| 02/16/2024 | RSBU - Building Final | Partial Pass | ||
| 02/20/2024 | RSBU - Building Final | Passed | ok for C OF O |