Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T22CM04707
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
07/07/2023 | RSBU - Building Final | Re-inspection required | 7/7/23: refrigerant line at a/c missing uv rated tape. Replace disconnect, disconnect for a/c unit sparks when pulled out and pushed back in, provide plans at final inspection. | |
07/11/2023 | RSBU - Building Final | Re-inspection required | 7/7/23: refrigerant line at a/c missing uv rated tape. Replace disconnect, disconnect for a/c unit sparks when pulled out and pushed back in, provide plans at final inspection. 7/11/23: refrigerant line at a/c missing uv rated tape, thermostat must be 54" above floor per plans. |
|
07/12/2023 | RSBU - Building Final | Passed |