Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
Permit Number - T22CM04442
Inspection Description - COT - RSPL - Plumbing Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | Not Ready | ||
06/14/2022 | COT - RSPL - Plumbing Final | RPARSON1 | Prior to Final Inspectn | Entered by RPARSON1 - NO FINAL UNTIL THE PUBLIC SEWER G-2020- 059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
04/03/2023 | COT - RSPL - Plumbing Final | Not Ready | Not ready for final inspection. | |
05/17/2023 | COT - RSPL - Plumbing Final | Not Ready | ||
06/20/2023 | COT - RSPL - Plumbing Final | Re-inspection required | 6/20/23: missing light bulbs at outdoor lights, water hose bib missing foam insulation and uv rated tape, electrical panel missing labeling for future solar use as per 2018 IRC code T103.9, refrigerant line for a/c not wrapped with uv rated tape, thermostat must be placed no higher than 54" OC above the floor per plans, provide ladder for attic access. | |
06/22/2023 | COT - RSPL - Plumbing Final | Passed |