Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM04442

Parcel: 141433560

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Permit Number - T22CM04442

Inspection Description - RSBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final  Not Ready
06/20/2023 RSBU - Building Final  Re-inspection required 6/20/23: missing light bulbs at outdoor lights, water hose bib missing foam insulation and uv rated tape, electrical panel missing labeling for future solar use as per 2018 IRC code T103.9, refrigerant line for a/c not wrapped with uv rated tape, thermostat must be placed no higher than 54" OC above the floor per plans, provide ladder for attic access.
06/22/2023 RSBU - Building Final  Passed 6/22/23 solar level on panel for future solar. All corrections have been made