Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/29/2024 | ENGR Engineering Final | Canceled | ||
| 01/29/2024 | ENGR Engineering Final | Canceled | ||
| 01/30/2024 | ENGR Engineering Final | Not Ready | ||
| 01/30/2024 | ENGR Engineering Final | Not Ready | Units 99 and 103 create trench at rear of property for drainage | |
| 02/13/2024 | ENGR Engineering Final | Passed | ||
| 02/13/2024 | ENGR Engineering Final | Passed | ||
| 12/13/2023 | ENGR Engineering Final | Not Ready | Units 90 thru 129 are in irrigation and landscape stage and will be recalled for inspection in 2 weeks 12/28/23. Overall site conditions are good and no concerns at this time. |