Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSBU - Building Final |
|
Not Ready |
|
| 12/12/2023 |
RSBU - Building Final |
|
Not Ready |
12/12/23: UV coat all exterior piping, vapor barrier needs to be sealed on north wall of unit 95, Vacuum breaker missing at hose bib. Range needs to be installed to verify anti-tip, water closet on first floor hall no connected to water line, mirror missing at first floor bedroom bathroom. NOT READY, STOPPED INSPECTION MORE ITEMS MAY BE ADDED AT RE-INSPECTION. |
| 12/13/2023 |
RSBU - Building Final |
|
Passed |
|