Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2022 | COT - RSPL - Rough Soil | Not Ready | tracer wire needs to be secured every 4’. | |
| 12/02/2022 | COT - RSPL - Rough Soil | Passed | okay to backfill, shading required. HCS is connected. |