Inspection Status: Re-inspection required (with fee)
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2023 |
RSBU - Building Final |
|
Re-inspection required (with fee) |
5/11/23: secure AC non-metallic conduit to the house, paint all exterior PVC & ABS, fuse missing at AC, remove all flexible drain lines, missing outlets at kitchen countertop per IRC E3901.4, wash was contaminated with paint wash-out. Clean the wash per instructions of Dave Roberts Supervisor Site Engineering for Tucson, Shower door missing, revise plans to show new kitchen floor plan and electric outlets, revise plans to show 220 V circuit to the space where the stove will go or remove the entire circuit. |
|
RSBU - Building Final |
|
Re-inspection required |
6-30-23: Per revision, car charging circuit needs to be completed. |
| 07/11/2023 |
RSBU - Building Final |
|
Passed |
|