Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCBU - Framing
Permit Number - T22CM04091
Inspection Description - COT - LCBU - Framing
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2022 | COT - LCBU - Framing | SCARRAZCO | Approved | Entered by NGARCIA3 - Approved |
10/05/2022 | COT - LCBU - Framing | SCARRAZCO | Not ready for Inspection | Entered by NGARCIA3 - not ready. Stud underneath stairway need to be continuous. |
08/23/2022 | COT - LCBU - Framing | TLUNDBERG | Partial Approval | Entered by VVERA1 - PA |
08/17/2022 | COT - LCBU - Framing | TLUNDBERG | Denied | Entered by VVERA1 - DE 1. Two king studs required at each end of patio door. King studs are to be continuous from base plate to top plate. 2. Remove blocks between GLB and posting by patio door. 3. Plans require 5 2x6 at mid bearing point of 5-ply truss 4. Remove mangled strap at 3-ply truss on 2nd floor and install new |