Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
Permit Number - T22CM03867
Inspection Description - COT - LCBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
08/10/2023 | COT - LCBU - Building Final | Not Ready | Not ready, multiple electrical issues throughout both units. Gfi's were required. Exhaust fans Not running. Lock out for water heater along with them being completely wired. Smoke detectors Not communicating. 8/10/2023 | |
08/31/2023 | COT - LCBU - Building Final | Partial Pass | 8/31/23 13104 passed waiting on 13204 to schedule | |
10/05/2023 | COT - LCBU - Building Final | Passed |