Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Framing | Not Ready | ||
| 01/22/2024 | COT - LCBU - Framing | Passed | ||
| 05/03/2023 | COT - LCBU - Framing | Partial Pass | Interior walls and demising wall is properly framed. Ceilings in small grow rooms are framed. Hallway is not framed waiting for final approval on whether it will be a hard lid or drop ceiling. | |
| 09/27/2023 | COT - LCBU - Framing | Re-inspection required | Interior walls and demising wall is properly framed. Ceilings in small grow rooms are framed. Hallway is not framed waiting for final approval on whether it will be a hard lid or drop ceiling. 9/27/23: No plans provided for inspection |