Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 10/18/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. No activity on site. No contact information provided |
| 10/11/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by DROBERT5 - Approved. AT&T cell tower. No activity on site. No personnel on site. No contact information provided. No history for three building inspections on permit. No plans available in Pro.
|
| 08/17/2022 |
PDSD Engineering Division Pre-Construction SITE |
MHERNANDEZ |
Continued |
Entered by VVERA1 - CN / MET WITH THE CONTRACTOR ON SITE .I INFORMED HIM THAT HE NEED TO SCHEDULE INSPECTION EVERY TWO WEEKS.
CONTRACTOR ASKED ME ABOUT THE HANDICAP PARKING.TO ME IT LOOK LIKE TO GO BACK TO DESIGN. |
| 08/16/2022 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by NGARCIA3 - IS APPROVED, MET WITH THE CONTRACTOR AND DISCUSSED THE ISSUES WITH NON-COMPLIANCE AND OTHER ISSUES AT HAND. I HAVE PROVIDED THE EMAIL ADDRESS FOR STEPHEN BLOOD AND LORAN MAKUS TO SEE IF THEY CAN ASSIST WITH THIS SITE AND A MINOR DEVELOPMENT PACKAGE FOR ALL THE WORK THAT IS HAPPENING OUTSIDE OF THE STRUCTURE.
|