Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
Permit Number - T22CM03346
Inspection Description - COT - RSEL - Electrical Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSEL - Electrical Final | Not Ready | ||
| 09/08/2022 | COT - RSEL - Electrical Final | TGAUSP | Denied | Entered by NGARCIA3 - Denied, plans call for 225A max rating on panel, 50A back-feed too much for existing conditions |
| 05/23/2023 | COT - RSEL - Electrical Final | Re-inspection required | ||
| 06/09/2023 | COT - RSEL - Electrical Final | Passed | Approved, DGC Clearance to TEP is required for the solar meter |