Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 03/16/2023 | RSBU - Building Final | Re-inspection required | Exhaust fan in master bathroom missing Light in toilet room in master bathroom not working Install bathroom door in guest room Post tension tag needed at water fixture outside of house |
|
| 03/17/2023 | RSBU - Building Final | Passed |