Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T22CM03197
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
04/11/2023 | RSBU - Building Final | Re-inspection required | Clean out cut to grade level, post tension tag, drain needs to be cut 6" above grade, install appliance on building final, water heater needs plate cover, weather resistant around entrance door, no attic access to check heat pump amp. | |
04/14/2023 | RSBU - Building Final | Re-inspection required | ||
04/17/2023 | RSBU - Building Final | Not Ready | 4/16/2023 No ladder on site for attic access. | |
04/18/2023 | RSBU - Building Final | Passed | 4/18/22 Pass |