Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 04/10/2023 | RSBU - Building Final | Re-inspection required | Over flow pipe for water heater not connected and needs to be trimmed to 6 inches from ground at exterior Level out A/C UNIT Caulk base of all toilets |
|
| 04/11/2023 | RSBU - Building Final | Re-inspection required | 4/11/23- low pressure a/c unit kinked, attic access, toilets need to be caulked | |
| 04/14/2023 | RSBU - Building Final | Passed |