Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/11/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Roof drain downspout needs to be attached to exterior wall. Gate, roof drain splash block, landscape, plants, and shrubs are completed. |
|
| 02/12/2024 | ENGR Engineering Final | Passed |