Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2024 |
ENGR Engineering Final
|
|
Not Ready |
Courtesy visit to discuss site requirements. |
| 06/25/2024 |
ENGR Engineering Final
|
|
Partial Pass |
The splash pad drainage on the east west south exceeds the 2%. Ranges from 2.05 to 2.58 on the north side it’s good there. |
| 06/28/2024 |
ENGR Engineering Final
|
|
Partial Pass |
I walked all of the site and have checked the area in question for non-compliance slopes and grades. It has been determined that the 4 foot area on both sides of the perimeter drain on the outside of the splash pad is non-compliant for Cross Slope. In most areas it exceeds the 2% maximum slope from the drain outward on both sides. This needs to be removed and replaced so that it is back within compliancy limits. A Letter has been submitted stating that this facility was Inspected and Approved by Parks and Recreation Staff and is in Compliance with the Approved Plans and all Codes and Requirements. |
| 02/13/2025 |
ENGR Engineering Final
|
|
Not Applicable |
This site was constructed without PDSD inspections and was inspected and approved by City of Tucson Parks and Recreation Department. |