Permit: T22CM03107

Parcel: 11508007E


Addresses:

1346 N STONE AV


Inspection Status: Passed

Inspection History: COT - HCBU - Building Progress

Permit Number - T22CM03107

Inspection Description - COT - HCBU - Building Progress

Inspection Status - Passed

Date Description Inspector Results Comments
01/17/2024 COT - HCBU - Building Progress Passed Per Jim Burge
01/20/2023 COT - HCBU - Building Progress Not Ready Contractor cancelled. Will reschedule for 23 January.
01/23/2023 COT - HCBU - Building Progress Partial Pass Information only. Set inspection schedule.
03/23/2023 COT - HCBU - Building Progress Partial Pass Information only for work and inspection scheduling.
04/03/2023 COT - HCBU - Building Progress Partial Pass Stem wall at GL: D/2.3 - 6.2. Ok to place concrete in progress areas.
07/10/2023 COT - HCBU - Building Progress Not Ready Contractor cancelled.
07/21/2023 COT - HCBU - Building Progress Partial Pass Inspection is for mechanical intermediate for unit rooms on Level #1. Ok to insulate and Sheetrock throughout.

NOTE: This permit does not have any Mechanical inspections listed. Need to have mechanical inspections attached to this permit.
07/26/2023 COT - HCBU - Building Progress Partial Pass
07/28/2023 COT - HCBU - Building Progress Partial Pass Level #1, East portion, room units spray insulation at ceiling/corridor area.
08/03/2023 COT - HCBU - Building Progress Partial Pass Level #3, strapping (1 1/2” - 3”) to level #4 in each room unit. Levels 1 - 3 corridors, 6” strapping at ceiling level for room entry areas.
08/08/2023 COT - HCBU - Building Progress Partial Pass Level #2, floor channel for framing (6”)
08/09/2023 COT - HCBU - Building Progress Not Ready Inspection to be rescheduled for 10 August.
08/11/2023 COT - HCBU - Building Progress Partial Pass Level #4, 6” strapping in corridor at ceiling height.
08/18/2023 COT - HCBU - Building Progress Partial Pass Scheduling for inspections for plumbing if and mechanical.
08/24/2023 COT - HCBU - Building Progress Partial Pass Pre-gunite flooring for level #4 in room units and corridors.
08/28/2023 COT - HCBU - Building Progress Partial Pass Information for shear wall,and clip for exterior and interior walls on levels 2 - 4
08/31/2023 COT - HCBU - Building Progress Partial Pass East shear walls on levels #1 & #2 (except for room 110). Ok to,tape progress areas.
09/05/2023 COT - HCBU - Building Progress Canceled Contractor cancelled.
09/07/2023 COT - HCBU - Building Progress Partial Pass Clips and screws for pop-outs at North wall, above level #2 through Level #4.
11/13/2023 COT - HCBU - Building Progress Partial Pass Sheetrock nailing in Level #3 rooms, North walls: except for rooms 301 and 305. Ok to tape progress areas.
12/11/2023 COT - HCBU - Building Progress Partial Pass Scheduling inspections for Temporary Certificate of Occupancy