Inspection Status: Not Ready
Inspection History: COT - HCBU - Exterior Clips/Sheathing
| Date |
Description |
Inspector |
Results |
Comments |
| 06/16/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Not Ready |
Contractor cancelled. |
| 06/20/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Hold downs (H1 and H2) on North exterior wall at Level #1. Reviewed SK-1 dated 30 May 2023 (Top of wall reinforcement), SK-2 dated 1 June 2023 (Blocking at offset truss) |
| 06/29/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Interior Sheetrock nailing: Level #1 corridor ceiling in place and taped. |
| 07/11/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Level #1, exterior walls sheathing. Ok to waterproof progress area. |
| 08/24/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Roof level parapet walls sheathing. |
| 08/28/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Exterior clips on South wall at Levels #1 & #2. CSK approved to show locations and placement. |
| 08/29/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
L-brackets for pop-outs on Levels #1 & #2 |
| 09/05/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
North wall pop-outs; clips at 4 feet on center up to the 10 foot level. |
| 09/22/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Level 2 units 12 - 15 Okay to proceed progress areas. 9/22/2023 |
| 10/11/2023 |
COT - HCBU - Exterior Clips/Sheathing |
|
Passed |
|