Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2024 | ENGR Engineering Final | Partial Pass | LEVEL 4 TCO engineering has no issues that would prevent a full-use temporary certificate of occupancy | |
| 03/20/2024 | ENGR Engineering Final | Passed |