Permit: T22CM03107

Parcel: 11508007E


Addresses:

1346 N STONE AV


Inspection Status: Passed

Inspection History: COT - HCPL - Plumbing Progress 

Permit Number - T22CM03107

Inspection Description - COT - HCPL - Plumbing Progress 

Inspection Status - Passed

Date Description Inspector Results Comments
01/17/2024 COT - HCPL - Plumbing Progress  Passed Per Jim Burge
04/07/2023 COT - HCPL - Plumbing Progress  Not Ready Contractor cancelled.
05/15/2023 COT - HCPL - Plumbing Progress  Partial Pass Plumbing pre-slab from elevator area to East stairwell area. Ok to place concrete in progress areas.
06/13/2023 COT - HCPL - Plumbing Progress  Partial Pass Private sewer line (8” line) from building to public sewer line for HCS secured connection (approximately 45 ‘). Plumbing application has been reviewed by Pima County.
07/24/2023 COT - HCPL - Plumbing Progress  Partial Pass Lint trap in place at North side of building. Ok to cover progress areas. Information for future placement of water heaters.
07/28/2023 COT - HCPL - Plumbing Progress  Partial Pass DWV lines in room units at East portion of Level #1.
08/02/2023 COT - HCPL - Plumbing Progress  Not Ready Contractor cancelled
08/03/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #1, waste and vent lines at 1 1/2” - 4”; throughout level #1.
08/08/2023 COT - HCPL - Plumbing Progress  Partial Pass Waste and vent lines (1 1/2” - 4”) in units 101, 102, 103, 104, 106 on Level #1 East.
08/09/2023 COT - HCPL - Plumbing Progress  Not Ready Inspection to be rescheduled for 10 August.
08/11/2023 COT - HCPL - Plumbing Progress  Partial Pass Lev #2, waste and vent lines; domestic water lines in room units.
08/28/2023 COT - HCPL - Plumbing Progress  Not Ready Contractor cancelled, will reschedule for 29 August.
08/29/2023 COT - HCPL - Plumbing Progress  Not Ready Leak on Level #2, repaired. Inspection areas not ready due to interior flooding.
08/31/2023 COT - HCPL - Plumbing Progress  Partial Pass Waste and vent lines in laundry rooms on Levels #1 and 2: 2 1/2” - 4” lines.
09/01/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #2, waste and vent lines (2” - 4”) in rooms 204, 205, 209, 211, 212.
09/07/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #2, waste and vent lines (2” - 4”) in rooms 202, 203, 206, 207, 212.
09/28/2023 COT - HCPL - Plumbing Progress  Not Ready Job site locked 1450 hours.
09/29/2023 COT - HCPL - Plumbing Progress  Partial Pass Waste and vent lines at 2” - 4” in rooms 313, 314, 315, 316, 317, 318, 413, 414, 415, 416, 417, 418
10/03/2023 COT - HCPL - Plumbing Progress  Partial Pass Waste and vent lines on Level #3 at 304, 305, 309, 310, 311, 312, (2” - 4”). Level #4 at 404, 404, 405, 409, 410, 411, 412 (2” - 4” lines).
10/06/2023 COT - HCPL - Plumbing Progress  Canceled Plumbing contractor cancelled.
10/10/2023 COT - HCPL - Plumbing Progress  Not Ready Plumbing contractor cancelled.
10/12/2023 COT - HCPL - Plumbing Progress  Partial Pass Waste and vent lines (2” - 4”) on Level #3, rooms301, 302, 303, 304 306, 307, Level #4, 401, 402, 403, 404, 406, 407
COT - HCPL - Plumbing Progress  Partial Pass 10/25/23:Domestic level 4 rooms 413,414,415,416,417,418
10/30/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #4, domestic water in rooms 404, 405, 410, 411, 412.
11/02/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #3 West, domestic water lines in rooms: 401, 402, 403, 406, 408, 409.

Fire caulking in Level #2 boiler room,; Level #3, corridors and room demising walls
11/06/2023 COT - HCPL - Plumbing Progress  Partial Pass Level #2 Janitor sink in place and hydro tested.
12/14/2023 COT - HCPL - Plumbing Progress  Partial Pass Janitor closet and mop sink in place,at level #3.
12/26/2023 COT - HCPL - Plumbing Progress  Partial Pass Janitor sink on Level #4 in utility room (domestic water piping)